|
| Year Completed: In Process Construction Cost:
Client:
San Jacinto River Authority
COH – Jeff Taylor (713) 837-0448 SJRA - Reed Eichelberger (936) 588-1111 Nature of the Work:
|
San Jacinto Water Rights
Project Description

Services Provided
Analyzing Scenario 3 of the 2003 San Jacinto River Basin TCEQ WAM, Espey Consultants, Inc. (EC) determined the feasibility of the following five applications:
- Joint Application for Unappropriated Firm Yield in Lake Houston (32,500 ac-ft);
- Joint Application for Unappropriated Flows Above Lake Houston (Run-of-River, 80,000 ac-ft);
- SJRA Developed Waters Return Flow Application (15,000 ac-ft);
- COH Developed Waters Return Flow Application (~600,000 ac-ft)
- COH Application for Unappropriated Flow in the Lower San Jacinto River Basin (160,000 ac-ft)
EC prepared each of the applications, supporting and technical documentation
and submitted each application to the Texas Commission on Environmental Quality
(TCEQ, formerly TNRCC) Water Rights Permitting and Availability Division. EC
also developed an Industrial Water Conservation Plan for industrial customers of
SJRA’s service area by surveying the individual users to determine a practicable
set of guidelines and measures. This plan was submitted to TCEQ in support of
SJRA’s applications.
EC provides continuous technical support of these applications as they track through TCEQ’s review process, enabling expedient determinations of administrative completeness and final approval.
|
||||||

